Danbury Hospital, Danbury, CT
Along with the new $150 million dollar expansion project at Danbury Hospital, the owners wanted to recondition the 1977
original 9-story tower. Cenaxo was selected for the application of a high-performance coating system to exterior metal
surfaces. A detailed plan was needed to coordinate the work from swing staging, which included power washing the entire
building, surface preparations, and coating applications. In addition Cenaxo installed caulking and joint sealants and restored
stucco elements on the tower.
The project required a plan to manage odors during the paint process because the hospital has a sophisticated air circulation
system that must operate 24/7. By working with Hospital Engineers, Cenaxo was able to get the materials applied while
allowing hospital operations to continue as normal.